The Warner & Swasey Servo ready for production
Viewed: 469 times.
|
Pindrafter(servo)for the NC Textile Technology Center in Belmont North Carolina
Viewed: 406 times.
|
Servo running 100% Scottish and New Zealand wool.
Viewed: 377 times.
|
Servo memory box
Viewed: 396 times.
|
The pin head
Viewed: 401 times.
|
removing the memory box
Viewed: 415 times.
|
Stripping down to the bare frame
Viewed: 418 times.
|
Draft rolls
Viewed: 385 times.
|
Unloading the servos
Viewed: 392 times.
|
Starting to clean the head for removal
Viewed: 316 times.
|
Removing the draft roll pressure unit
Viewed: 324 times.
|
Timing the lower head
Viewed: 307 times.
|
IMG 8725
Viewed: 283 times.
|
IMG 8726
Viewed: 283 times.
|
Ready for installation on the frame
Viewed: 273 times.
|
Mounted on the frame
Viewed: 268 times.
|
A clean memory box,PIV and pump
Viewed: 262 times.
|
Memory box calibrated
Viewed: 285 times.
|
|
Sandblasted frame ready for priming
Viewed: 271 times.
|
Pin ready to load with fallers
Viewed: 287 times.
|
Putting the covers on
Viewed: 268 times.
|
Our first run with the large measuring rolls
Viewed: 258 times.
|
Rebuilding the coiler
Viewed: 253 times.
|
Linking the servo with the coiler
Viewed: 250 times.
|